New Construction

New Construction

Ryan Fireprotection provides a complete solution for new construction, from design engineering to fabrication and installation. Count on Ryan to handle every aspect of the job, and to complete it on time and under budget.
Design Engineering icon

Design Engineering

Quality construction begins with extensive research and preparation. Ryan Fireprotection begins every new construction project by mapping out detailed plans using advanced CAD programs. Digital blueprints allow us to chart the installation of fire protection systems around other trades. This commitment during the planning process means there are fewer unwelcome surprises or delays later.
Fabrication icon

Fabrication

Ryan Fireprotection’s in-house state-of-the-art fabrication shop saves time and money, and allows us to ensure quality control.  From fabricating large‑sized manifolds to working with stainless-steel piping, our experienced fabrication team contributes to a quality new construction job done right and to the highest expectations.
Installation icon

Installation

Ryan Fireprotection puts a team of highly-skilled technicians at your service to install fire detection, alarm, and suppression systems that are right for any new construction project – commercial or residential, wet or dry system, underground piping or water storage tanks, brand new facilities or building expansions.

FedEx SmartPost Hub

Indianapolis, IN

FedEx introduced SmartPost to help address the need for more cost-effective solutions for residential shipping. To manage the high volume, FedEx has 25 hubs throughout the United States, including a facility in Indianapolis. During construction, Ryan Fireprotection installed five dry sprinkler systems.

Ironworks Hotel

Indianapolis, IN

This five-story boutique hotel on the north side of Indianapolis required expert installation of a new wet sprinkler system. The mixed-use space on the first floor has a restaurant on one side of the lobby and retail space on the other. The contemporary design of the building features exposed mechanicals and ductwork, offering a rare opportunity to see our team’s ingenuity in plain sight.

 

W. W. Grainger Industrial Supply

Louisville, KY

This FM Global-insured project was massive in scale and demanded strict adherence to industry requirements, including special PSI standards. Ryan Fireprotection installed more than 20,000 sprinkler heads over a 1.45-million-square-foot area that featured specialty AFFF foam in an area that stores highly flammable aerosol liquid.

Indiana Convention Center

Indianapolis, IN

When it was originally built in the 1970s, the Indiana Convention Center covered the span of about two blocks. Now, after multiple expansions, it covers six blocks and is the 16th-largest convention center in the United States. During the most recent expansion project, Ryan Fireprotection installed multiple fire sprinkler systems, including wet, dry, and pre-action.

Clariant Global

Louisville, KY

For the recent expansion of Clariant’s manufacturing facility, Ryan Fireprotection designed and installed multiple special hazard systems that use infrared/ultraviolet flame detection for immediate warnings, combined with fire pumps and foam suppression to protect the raw material and finished product inventories.  Clean agent systems were implemented in data processing rooms to protect high-value assets and maintain operations in the event of a fire.

IU Health Simon Cancer Center

Indianapolis, IN

The Simon Cancer Center is a state-of-the-art hospital and research center, with the need for state-of-the-art fire protection systems. During a recent expansion and renovation, Ryan Fireprotection installed the wet and dry sprinkler systems. The use of building information modeling (BIM) technology allowed us to expeditiously resolve concerns so that Simon Cancer Center could continue providing patients with critical treatment and care.

Axis on Washington

Louisville, KY

This complex is comprised of three five-story buildings, with garage space below. We installed wet systems with over 4,500 sprinkler heads in the residential areas, a standpipe system, and a dry system in the attic. These buildings are unusually tall for wood structures, which required us to create a bird cage system to hang the pipes securely.

Roche Diagnostics

Indianapolis, IN

Ryan Fireprotection installed a large, spiral staircase stretching up three floors at Roche Diagnostics. The team needed to bend, braze together, and hang copper wire to the same arc and dimensions as the staircase. No one had been able to accomplish this before, but our team prevailed in designing and installing this fire safety system in Roche’s US headquarters.

360 Market Square

Indianapolis, IN

Built on the site of the former Market Square Arena, 360 Market Square is the newest luxury high-rise to dot the Indianapolis skyline. Featuring both wet and dry systems, this 28-story structure required more than 5,000 sprinkler heads and a fire pump in the basement. Ryan Fireprotection expertly installed specially designed flexible pipe to match the exterior curves and elliptical design of the structure.

Music City Center

Nashville, TN

Built in 2013 to encourage organizations to bring their conventions to Nashville, Music City Center has hosted everything from home and auto shows to the Wizard World Comic-Con. Ryan Fireprotection installed 19,500 sprinkler heads and 85 fire suppression systems, including underground, pre-action, and dry, in this 2.1-million-square-foot facility.